Murrieta Creek stabilization
Murrieta Creek's flood control project uses PROPEX Armormax for erosion protection and environmental restoration, ensuring safety and water quality for 75 years.

january 2024

2 Min read

Share
Download PDF

Murrieta Creek stabilization

Overview

Murrieta Creek has a history of devastating flooding. Notably, the flood of 1993 that claimed the lives of five people and damaged 70 aircraft and two bridges at Pendleton Marine Corps Base. The flood also inundated pumps at the Eastern Municipal Water District, causing 5 million gallons of raw sewage to flow into the creek. Multiple major flood events have occurred since the 1993 flood. Today, more than 600 homes and commercial structures are vulnerable to flooding.

Solution

In 2000, the U.S. Army Corps of Engineers initiated the Murrieta Creek Flood Control, Environmental Restoration and Recreation Project to mitigate flooding. In phase two of the project, PROPEX® Armormax was selected to provide erosion and scour protection on the creek banks.

The system consists of High Performance Turf Reinforcement Mat (HPTRM) and earth anchors that provide resilient flood control for up to 75 years. Maintaining water quality was a main concern because Murrieta Creek is recognized as one of the last high quality, minimally disturbed riverine environments in Southern California.

PROPEX Armormax helps to decrease sedimentation and pollutants and encourages infiltration of water back into the groundwater table. The system also promotes rapid root development for long-term vegetation, whereas rock riprap, can decrease streamside vegetation and adversely impact fish populations. Vegetation was quickly established, and PROPEX Armormax has effectively protected the channel from erosion and flooding