Efficient bridge abutment with a mechanically stabilized earth wall using MIRAFI
Overview
The NLEX-Ciudad de Victoria Interchange project aimed to improve mobility and accessibility in Bulacan, connecting Bocaue, Sta. Maria, Pandi, Norzagaray, Angat, and nearby towns. The bridge abutment construction had to be completed within a tight deadline of less than 10 months, and the challenge was that the abutment needed to be built on soft foundation soil.
Challenge
Design & Construction:
To meet these requirements, the chosen design for the project was a Mechanically Stabilized Earth Wall using MIRAFI® Polyfelt PEC Series composite geotextile. This system allowed the use of on-site soil backfill, as the composite geotextile had excellent drainage properties and could reinforce finer-grained soils. The installation process was straightforward, involving laying the geotextile horizontally on the prepared surface with slight tensioning, followed by placing and compacting the backfill soil.
Solution
The Mechanically Stabilized Earth Wall system proved to be the preferred choice for both designers and contractors. Its advantages included an easy and rapid construction technique, superior performance properties of the geocomposite, and cost-effectiveness.
Please note that imperial conversions for measurements were not provided in the original text, so no conversions are needed in this case.
NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES
NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES
NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES
NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES
Explore more case studies
View allSilt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.
Soft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.