Beach enhancement at Marina of Portimão
Overview
The Marina of Portimão, specializing in marina operation and maintenance, embarked on a project to create a beach with reduced wave action. The initiative aimed to enhance beach attractiveness and reduce maintenance requirements. The project, originally scheduled for 2022, was executed in 2023 near the entrance of the Port of Portimão. Solmax and Geosin, leveraging their European project experiences, updated the initial design by Consulmar to meet specific needs. This project promised significant benefits for the Marina of Portimão, including future maintenance cost savings.
Challenge
The installation of the Solmax GEOTUBE® systems was a primary component of this project, conducted by a diving company skilled in underwater operations. The project faced challenges typical of marine environments, such as weather fluctuations and sea conditions, which could potentially delay the filling process and installation. These issues were mitigated by the diving company's meticulous preparation, supported by Solmax and Geosin's expertise. The project's uniqueness lay in its innovative underwater installation method, the first of its kind in Portugal.
Solution
Solmax’s role was pivotal in the successful completion of this project. The primary products used were the Solmax GEOTUBE systems (Ø3,25 m [10.7 ft] GT1000MB) and GEOTUBE Scour aprons GT600M. These products were selected based on water depth, hydrological circumstances, and their suitability for the beach environment. The sand colored GEOTUBE GT1000MB blended well with the beach, and all products were CE certified and adhered to ISO standards. This project demonstrated the advantages of using GEOTUBE systems over traditional rock solutions, highlighting their reversibility and utilization of local filling materials. Notably, the project was completed ahead of schedule, underscoring Solmax’s expertise, product quality, and the effectiveness of the distributor. This success has set the stage for future collaborations.
Installation of Solmax GEOTUBE systems at Marina of Portimão, with divers and marine equipment actively working in the water.
Installation of Solmax GEOTUBE systems at Marina of Portimão, with divers and marine equipment actively working in the water.
Explore more case studies
View allSoft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.
Silt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.