Case studies

Soft-soil consolidation improvements ensure new housing development launches on time

november 2024

Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.

Read the article

Filter by

quarrying
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry

A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.

quarrying
Silt trap dewatering for Kestrel Coal Mine

Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.

quarrying
Addressing water ponding issues at Selangor Turf Club using MIRAFI

MIRAFI FWL geotextile was installed at Selangor Turf Club to address water ponding issues, enhancing drainage efficiency and ensuring prompt track usability.

quarrying
Addressing surface cracking on Queen Street, Yeppoon

Livingstone Shire Council used MIRAFI H2Rx to upgrade Queen Street, Yeppoon, addressing surface cracking due to a soft, saturated subgrade.

quarrying
Improving subgrade stabilization and moisture management in roadways

Libmanan Road in Camarines Sur was reconstructed using MIRAFI H2Rx geotextile for improved subgrade stabilization and moisture management, enhancing road durability.

quarrying
Rebuilding U.S. Route 441 and enhancing flood resilience with MIRAFI

U.S. Route 441 in Gainesville, Florida was reconstructed using MIRAFI RS580i, improving performance against flooding and reducing maintenance needs.

quarrying
Palm Desert flood control improvements with PROPEX protects from tropical storms

The City of Palm Desert improved flood control infrastructure by expanding the Section 29 Basin, constructing two new basins, and armoring the Mid-Valley channel with PROPEX Armormax. 

quarrying
Slope stabilization for residential slope failure at Yerba Buena Island with PROPEX

Yerba Buena Island's redevelopment addressed slope failure with PROPEX Armormax, ensuring slope stability, erosion control, and utility protection during a major residential project. 

quarrying
Motiva Brine pond liner replacement and leak inspection with GSE

The Motiva Brine Pond in southeast Texas, supporting butane storage in salt caverns, underwent primary liner replacement and inspection to address leakage issues. 

quarrying
Relining Aeration Basin 2 at Thompson's Station wastewater plant

Aeration Basin 2 at Thompson's Station wastewater plant was relined in 2012 using a custom GSE HD geomembrane system, ensuring operational efficiency. 

quarrying
Geosynthetic reinforcement to successfully repair a railway track section

CN Railway utilized MIRAFI RS580i to stabilize track foundations at the Rosetown subdivision, improving safety, and reducing future maintenance costs in challenging conditions. 

quarrying
Effective landfill closure at Homer Solid Waste Facility with GSE

Kenai Peninsula Borough in Alaska completed phase two of the Homer Solid Waste Facility landfill closure using Solmax geosynthetics, covering 226,000 ft² with a geosynthetic clay liner, drainage, and landfill-gas system.

quarrying
Improving the durability and performance of pavement under heavy traffic conditions 

Using MIRAFI® H2Rx woven geotextile to improve pavement performance on Thailand's National Highway No. 117, addressing severe pavement damage.

quarrying
Reconstructing Jalan Kampung Lombong road with MIRAFI

The Jalan Kampung Lombong road reconstruction in Klang, Selangor, improved durability, and load capacity, addressing frequent truck traffic and adverse weather challenges.

quarrying
GEOTUBE Geobags used in coastal erosion control and protection project 

In 2023, GEOTUBE Geobags were used to stabilize the eroding Brunei coastline, enhancing safety and sustainability.

quarrying
Restoring tidal wetlands and providing long-lasting erosion protection

The Department of Water Resources (DWR) successfully restored natural tidal wetlands in the Sacramento–San Joaquin Delta, enhancing habitats for wildlife and improving flood management.

quarrying
Protecting homes from destructive erosion and slope instability with PROPEX

In Fort Worth, Texas, Candleridge Park addressed erosion threatening neighborhood foundations by constructing a channel outlet and using PROPEX Pyramattress and PROPEX Pyramat 75 for cost-effective, sustainable slope protection.

quarrying
Managing subgrade stabilization and moisture for railway structures with MIRAFI H2Rxx

China Academy of Railway Sciences utilized MIRAFI H2Rx products to manage subgrade moisture and frost heave in the Harbin-Yichun High-speed Railway, ensuring stability and environmental protection.

quarrying
Mitigating the risks of groundwater contamination during expansion of Sarasota Municipal Landfill

Advanced leachate containment solutions were utilized to enhance the Sarasota landfill expansion, ensuring environmental protection and compliance with regulations.

quarrying
Advancements in sand island reclamation with GEOTUBE Marine technology

GEOTUBE Marinetechnology was employed to construct a dyke, effectively reclaiming 507 acres in Malaysia.

quarrying
Robust geomembrane lining for ITY Gold Mine tailings storage facility

Endeavour Mining Corporation's ITY gold mine in Côte d'Ivoire, employing Solmax's GSE HD geomembrane, successfully completed its tailings storage facility project ahead of schedule.

quarrying
Bridging sinkhole voids with MIRAGRID XT

Thurber Engineering and Solmax used MIRAGRID XT geogrid to remediate William Griffin Recreation Centre's turf, stabilizing voids and enhancing field performance. 

quarrying
Improving waste management with GSE

To meet the growing needs of a rapidly expanding resources industry, Pilbara Regional Waste Managment used GSE geomembranes at their new waste management facility.

quarrying
Trilogy at Monarch Dunes, Nipomo, California

Monarch Dunes needed a sustainable solution for severe channel erosion in a community vineyard. The combination of PROPEX Armormax and Pyramattress provided durable, eco-friendly stabilization, reducing installation time and cost.

quarrying
Improving the grading and capacity of an existing channel

The Lloydminster's Northwest Drainage Channel was redesigned to prevent flooding, using PROPEX Pyramat for enhanced flow capacity and erosion control.

quarrying
Protecting homes from flooding events with PROPEX Armormax

Baton Rouge's flood mitigation measures included PROPEX Armormax to reduce risks and protect homes against future flooding.

quarrying
Subgrade stabilization of a railway with MIRAFI HMi

Discover the Kayseri Boğazköprü project's transformative approach to railway subgrade stabilization using MIRAFI HMi for subgrade stabilization. 

quarrying
Roadway reconstruction on STH-106 with MIRAFI

Jefferson County Highway Department successfully reconstructed Wisconsin Highway 106 over marshland, using geosynthetic materials to minimize excavation and ensure a stable, well-drained road surface.

quarrying
Stabilization and construction of a new arterial roadway in using MIRAFI

Effective stabilization of fine-grained subgrade soils and the implementation of MIRAFI RS580i led to a new roadway that exceeded performance expectations.

quarrying
Stabilizing embankments under challenging conditions with MIRAGRID

Exploring the Kuzmin-Sremska Raca project, a key infrastructure initiative aimed at enhancing Serbia-Bosnia connectivity through strategic construction.

quarrying
Overcoming soft soil challenges with MIRAFI

Utilizing MIRAFI RS580i for stable construction, the East Lake Sammamish Trail overcame soft soil challenges, reducing costs and material waste effectively.

quarrying
Building a parking lot over soft soils with MIRAFI HMi

The Lidl parking lot project in Teterow used MIRAFI HMi to address poor soil conditions, achieving enhanced structural integrity. Completed on time, the project set new benchmarks in geotechnical engineering.

quarrying
Transforming Shanghai's waste management with a double layer landfill

Shanghai's first double-layer rigid structure landfill overcame challenges of material supply and competition, to ensure successful completion and extended the landfill's service life with GSE HD geomembranes.

quarrying
Stabilizing unpaved access roads on a solar farm

The solar photovoltaic farm project near Almendralejo, Spain, optimized unpaved internal roads using geosynthetics to address low bearing capacity and challenging subgrade conditions. Despite unexpected rains, the use of MIRAFI HMi ensured stability and durability.

quarrying
Improved connectivity and resilience for the Chiang Rai bypass road project

MIRAGRID GX geogrids transformed Chiang Rai's infrastructure, boosting safety and efficiency as well as seismic resilience.

quarrying
Urban water management improves water quality and wildlife

Ishøj Lake transformed using tube GEOTUBE dewatering to improve water quality and support wildlife.

quarrying
Enhancing frac pond liner integrity with the GSE Leak Location Suite

The GSE Leak Location Suite, including the S-100 Spark Tester, was successfully implemented at a frac pond project in Laredo, Texas, ensuring leak-free installation and quick identification of punctures in the liner.

quarrying
Meeting subgrade stabilization challenges with MIRAFI

Utilizing MIRAFI RS380i geotextile fabric, this project overcame poor subgrade conditions to construct four commercial buildings with stable platforms for parking lots and loading docks.

quarrying
Coastal defence solution safeguards wind energy infrastructure

Innovative project connects wind farms to the grid, using a massive sand-based platform to prevent flooding and ensure energy transition.

quarrying
Biogas cover turns palm oil waste into fuel in Malaysia

Cenergi transforms POME into renewable biogas in Malaysia, using GSE geomembranes. This project reduced GHG and the approach highlights innovation in waste recycling and contribution to renewable energy goals.

quarrying
Beach enhancement at Marina of Portimão

The Marina of Portimão project, led by Solmax and Geosin, innovatively created a beach with reduced wave action, using underwater GEOTUBE systems, enhancing attractiveness and reducing maintenance costs.

quarrying
Enhancing coastal resilience at La Croisette Beach, Cannes

GEOTUBE systems played a crucial role in coastal protection for Cannes' iconic La Croisette beach, ensuring resilience and uninterrupted beachside experiences.

quarrying
Transforming a historic railway into a cycle path with MIRAGRID

Austria's Haager Lies became its first barrier-free cycle path, transforming a historical railway through strategic engineering and materials to boost the regional cycle network. 

quarrying
Impermeable heap leach pads for gold mine

In a West African gold mine, tailored geomembrane solutions improved environmental safety and resource recovery, adapting to specific site needs.

quarrying
Meeting stringent CCR regulations with BENTOLINER

Xcel Energy successfully closed Sherco Pond No.1 and constructed Sherco Pond No.2 using BENTOLINER to meet stringent CCR regulations, ensuring minimal environmental impact and continuous service.

quarrying
Contaminated water management at Europe's largest nickel mine

Europe’s largest nickel mine faced environmental challenges from water contamination due to rainfall, mining activities, and a tailings pond leak, requiring an innovative GEOTUBE technology solution.

quarrying
IMAX parking lot's innovative stormwater system with MIRAFI

In 2012, Mississauga's IMAX parking lot implemented a low impact development system to manage stormwater, enhancing water quality and maintaining pavement integrity.

quarrying
Enhancing road resilience in Alaska with MIRAFI

Alaska's Dalton Highway demonstrated the effectiveness of MIRAFI H2Ri in enhancing road durability and reducing maintenance in extreme environments. 

quarrying
Protection of the beach of Hotel Oceana Club in Moudania, Greece.

In Greece, a hotel enhanced its beach experience by installing submerged GEOTUBE breakwaters, reducing wave intensity and maintenance.

quarrying
How Impact Solar Farm overcame road stabilization challenges with MIRAFI

MIRAFI RS280i was used at Impact Solar Farm in Texas for efficient road stabilization, offering environmental benefits and cost savings.

quarrying
Sewage lagoon upgrade using geosynthetic clay liners

Discover how Conquest's sewage lagoon upgrade using a geosynthetic clay liner overcame groundwater challenges, enhancing efficiency and reducing costs.

quarrying
Increasing roadway design life with MIRAFI

116th Ave in Grande Prairie was reconstructed using MIRAFI H2Ri, overcoming failures from heavy traffic and challenging soil, improving road longevity and performance.

quarrying
Lining canals for mega Port Said aquaculture project

Egypt's mega aquaculture project in East Port Said completed phase two, using GSE HD geomembrane for water containment in a 20,000-acre fish and shrimp farm.

quarrying
Conquering extreme conditions with a high-temperature liner solution

Saskatchewan's first new potash mine in 40 years features advanced GSE HDH liners in its brine ponds, overcoming extreme temperatures and chemical exposure.

quarrying
Murrieta Creek stabilization

Murrieta Creek's flood control project uses PROPEX Armormax for erosion protection and environmental restoration, ensuring safety and water quality for 75 years.

quarrying
Harvey Ditch erosion protection with PROPEX

BKDD used PROPEX Scourlok for durable, environmentally-friendly erosion protection along a drainage channel in Texas, replacing gabion baskets with a long-lasting solution.

quarrying
Kaneohe Stream bank restoration

Hawaii's Kaneohe Stream stabilization project used PROPEX Pyrawall, a natural, vegetated solution, to protect properties and prevent flooding for up to 75 years.

quarrying
Oyster Lake outfall improvement

Oyster Lake's outfall, strained by storms and urban growth, was reinforced using PROPEX Armormax for erosion control. It withstood Hurricane Michael, protecting the area.

quarrying
GSE Leak Location Conductive liner 24 years later

At the Florence Copper mine in Arizona, a pond built in 1997 with GSE Leak Location liner, operated for 24 years. Initially underutilized, its expansion required inspection of the exposed geomembrane.

quarrying
Anchorage regional landfill-expansion project

In 2020, Anchorage expanded its landfill with a new cell, installing a composite liner system that included BENTOLINER, GSE HD liner, and HDPE piping.

quarrying
Providing long term stabilization for drainage channel

PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

quarrying
Steep slope stabilization at SR-11 KYTC DISTRICT 10

The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

quarrying
Providing levee resilience and durability

Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.

quarrying
Preventing flooding from arid creeks

PROPEX Armormax helped to decrease sedimentation and pollutants and encourages infiltration of water back into the ground water table.

quarrying
Restoring stream bank while promoting vegetation

Since the completion of the project, the stream has naturally restored itself to its original channel depth.

quarrying
Channel stabilization protects against floods

The end goal of the project is to carry water from future 100-year floods through the city in the channel and eliminate flooding in Randolph.

quarrying
Flood protection and erosion control with PROPEX Pyramat

PROPEX Pyramat is a High Performance Turf Reinforcement Mat (HPTRM) that protects the ground surface from erosion while promoting natural vegetation.

quarrying
Reinforcing slopes in parking lot

Eight, one foot, PROPEX Pyrawall lifts were constructed to raise the grade for the new parking lot.

quarrying
Stabilizing the Des Moines River with PROPEX

The west fork of the Des Moines River in Palo Alto County, had experienced years of erosion and flooding. From 2006 to 2019, the riverbank had receded up to 215 feet in the middle of the bend.

quarrying
Enhancing runway durability with Petromat Enviro

The Altoona-Blair County Airport, a regional airport in central PA, faced a safety concern with one of its runways. Reflective cracking had occurred due to harsh freeze/thaw conditions during winter months.

quarrying
GEOTUBE dewatering and containment of gypsum wastes at a titanium dioxide plant

Industrial waste, often in slurry form and containing contaminants, needs to be managed and disposed of properly to protect the environment.

quarrying
GEOTUBE directs fly ash slurry flow in tailings storage facility closure

GEOTUBE dewatering technology is a cost-effective method for removing water from industrial and mineral slurries and sludges.

quarrying
GEOTUBE breakwaters: shoreline protection at Sigandu Beach

The breakwater structure constructed with the GEOTUBE system at Sigandu Beach proved to be a cost-effective solution compared to conventional methods such as rock armor.

quarrying
Maximizing mineral recovery with dewatering for a remote gold mine in Indonesia

A remote gold mine located on an Indonesian island required the dredging of heavily silted settling ponds. These ponds contained valuable gold deposits that needed to be recovered and reprocessed.

quarrying
Recovering fertilizer from palm oil mill effluent (POME) with GEOTUBE dewatering technology

GEOTUBE units are used to dewater the POME sludge. The units retain the solid particles within the tube, while the liquid can be recycled back through the plant or discharged through the polishing ponds.

quarrying
GEOTUBE solution for rare earth waste containment and dewatering

Processing and refining rare earth minerals generates a waste stream that must be managed and stored in an environmentally secure manner.

quarrying
Overcoming workspace constraints in urban municipal wastewater treatment plant

The project involved upgrading an old, aerated sewage lagoon into a modern enclosed underground sewage treatment facility.

quarrying
Mine wastewater management at MMG Rosebery Gold Mine

The MMG Rosebery mine in Tasmania has been a successful underground mining operation for over 80 years, producing gold, zinc, copper, and lead concentrates.

quarrying
Transforming coal mine settling ponds with GEOTUBE dewatering

A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia.

quarrying
Durable GEOTUBE solution for Clark Airport waterway revetment

The GEOTUBE SFM serves as revetment for the entire waterway network at the new Clark Airport Terminal.

quarrying
GEOTUBE dewatering: Innovative submerged sediment removal at Brisbane River

In a groundbreaking project in Australia, a specially designed remote-controlled underwater dredger was used to clear and clean a blocked stormwater drain that discharged into the Brisbane River.

quarrying
Asia's longest dewatering GEOTUBE in Indonesia's Kalimantan region

This project holds the distinction of being Asia's longest GEOTUBE dewatering project.

quarrying
Revitalizing Tianjin Eco-City: Sustainable wastewater cleanup and transformation

The GEOTUBE dewatering containers were used to contain the dredged slurry and remove water from the material, achieving a consistency similar to compacted borrowed material.

quarrying
Geocontainment solutions for riverbank protection in Tanjung Manis, Malaysia

The OGC jetty expansion project aims to construct two berths, each 200 m (656 feet) long with a 12m (39 feet) draught, to accommodate larger vessels. The project also involves bank protection works.

quarrying
Subgrade stabilization for stormwater management

Geosynthetics, such as MIRAFI HP380a geotextile, have proven to be effective in enhancing the performance of roads and load support structures.

quarrying
Riverbank erosion protection with woven geobags in Sungai Choh, Malaysia

The housing developments near Sg. Choh in Selangor, Malaysia experiences high surface runoff, causing a significant increase in the river's water volume. This has led to severe erosion along approximately 200 m of the riverbank, posing a risk of collapse.

quarrying
Enhancing soft soil embankments with MIRAFI

A 2 km (1.2 mi) causeway had to be constructed through a river estuary as part of the services corridor. The estuarine mud foundation in the river estuary was soft to firm, posing challenges for construction.

quarrying
Strengthening steep slopes with geocomposite reinforcement

To make the project cost-effective and efficient in terms of logistics, a reinforced soil system utilizing the available on-site earth was chosen. The excavated residual soil, which has a high fines content, could be used as backfill material.

quarrying
Pengerang Integrated Petroleum Complex: Basal reinforced embankment solution

The access road plays a vital role in reducing transportation distance and time. To create the road network, a series of basal reinforced embankments were designed based on the existing ground terrain.

quarrying
Enhancing embankment stability on soft soil for Navi Mumbai Coastal Road

MIRAFI PET 800/50, a high strength polyester woven geotextile with a tensile strength of 800kN/m (45.4 lb/ft), was employed to ensure embankment stability within the specified criteria.

quarrying
Road base reinforcement at NAIA Expressway, Paranaque City, Philippines

The NAIA Expressway is a 1.6 km (1 mile) elevated expressway in Metro Manila, Philippines. It connects the Metro Manila Skyway to Ninoy Aquino International Airport and Entertainment City, serving as the first airport expressway in the country. 

quarrying
Protecting Langkawi's Meritus Pelangi Beach with GEOTUBE

The installation process involved deploying scour aprons and filling anchor tubes prior to placing the GEOTUBE unit. The targeted shoreline area was trimmed back before laying the filled Geobags in an overlapping shingle style from the embankment's base.

quarrying
Slope failure repair using MIRAFI Polyfelt PEC: Langkawi, Malaysia

The reinforced soil structure consisted of a 30m-high (98 ft) slope reinforced from the toe of the failed embankment. The facing system used involved wrapping a net around bags filled with fine-grained soil.

quarrying
Road embankment slope repair with MIRAGRID GX

The road connecting Khun Tan and Lampoon in Northern Thailand is vital for their economic link. Unfortunately, the embankment at KM 11 failed, causing significant traffic disruptions and posing risks to road users.

quarrying
The longest sea-crossing bridge constructed with GEOTUBE

Over 27 km (16.8 miles) of geotextile tubes were installed for the construction of the Lach Huyen Bridge in Vietnam.

quarrying
Enhancing road infrastructure with a reinforced soil wall

After careful analysis, it was determined that a segmental retaining wall using MIRAFI Polyfelt PEC was the most suitable option compared to alternatives such as building a bridge or excavating the hill.

quarrying
Geotextile solution for seafloor pipeline laying in Jamnagar, Gujarat

The Jamnagar refinery, located in northwest India, is a crude oil refinery with a production capacity of 661,000 barrels per day.

quarrying
Constructing an artificial island with GEOTUBE

For constructing the edge levees that formed the temporary platform, GEOTUBE GT1000 was chosen.

quarrying
Basal reinforcement with MIRAFI PET geotextiles

MIRAFI PET reinforced geotextiles proved to be the most economical solution for addressing the localized failure of the road embankment.