Products
Industries
Roadway reconstruction on STH-106 with MIRAFI
Overview:
Wisconsin Highway 106 (STH-106) underwent reconstruction over a marsh area but soon faced problems with uneven settling. The Jefferson County Highway Department sought a quick reconstruction method that would limit the need to remove large volumes of wet, organic soil while ensuring a stable base for the flexible pavement road. The solution needed to be sturdy enough to prevent uneven settling along the road, maintaining a smooth and ridable surface.
Challenge:
The main challenge was dealing with wet, saturated silt and peat deposits, extending over 30 feet (9.14 m) beneath the existing pavement. The solution involved a robust construction approach using a single layer of MIRAFI® H₂Ri geosynthetic material placed directly on the subgrade. This was followed by a 15-in (38 cm) layer of crushed stone, a layer of MIRAFI BXG110 biaxial geogrid, and another 15-in (38 cm) layer of crushed stone. The MIRAFI H₂Ri reinforcement and moisture management created a "raft"-like platform for the road, improving drainage, particularly during spring thaws and heavy rains.
Solution:
The Jefferson County Highway Department was satisfied with the installation process. The multi-layer geosynthetic reinforcement provided a strong, stable base, allowing for smooth paving operations. This robust system reduced the need for subgrade removal to just 30 in (76 cm), significantly less than the 5-8 ft (1.52-2.44 m or more) that might have been necessary given the soil conditions. The MIRAFI H₂Ri not only saved costs but also allowed for quicker installation.
The multi-layer geosynthetic reinforcement provided a strong, stable base, allowing for smooth paving operations
Explore more case studies
View allInnovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.
Silt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.
Soft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.