Soft-soil consolidation improvements ensure new housing development launches on time
Overview
The developers of the new Summarecon Housing Estate in Bandung, the capital of Indonesia’s West Java province, were in a bind. With only seven months to go before the planned launch of their development, they needed to find a speedy solution to a soft-soil consolidation problem they had discovered.
In normal circumstances, the builders - Summarecon Bandung Ltd. - would have used the PVD pre-loading method to consolidate the soil, but their deadline didn’t allow for that. So they decided to go for a PVD vacuum-consolidation solution instead. With less surcharge loading, this method would mean that they could keep to their launch timetable and respect their go-to-market schedule.
Challenge
The project required a geomembrane product that would be both durable and supple - in effect, a combination of both HDPE and LLDPE. It also needed to be large enough to cover an area of over 200,000 m². And that’s when the site engineer turned to Solmax, having decided that we were the only credible option to supply and install that quantity of geomembrane material in such a short timeframe.
Solution
Working in close collaboration with the project engineers and our local installation contractors, PT. Teknindo Geosistem Unggul, Solmax manufactured, supplied and installed 200,000 m² of our GSE® HD 1 mm Black Smooth geomembrane. Although LLDPE is considered more suitable for vacuum-consolidation applications, Solmax developed a tailor-made and project-specific GSE HD solution that met the developer’s requirements.
By deploying Solmax’s unrivalled GSE HD Black Smooth product, the developers were able to achieve full soil consolidation in just four months, thereby enabling the new development to launch on time.


Explore more case studies
View allMIRAFI geotextiles prevent subgrade failure and reduce track downtime
Canadian Pacific Railway (CP) identified track settlement issues and partnered with Solmax and Clifton Associates to implement a geosynthetic solution, reducing ballast use by 43% and completing repairs on a 72 ft section in under seven hours.

MSE walls with MIRAGRID XT for rail expansion
GO Transit used hybrid MSE walls with MIRAGRID XT geogrids to stabilize embankments on Lakeshore West Line, ensuring stability under space and load constraints.
Stabilizing soft clay soils and shallow utilities during the reconstruction of Main Street
Main Street in Palisade, CO, was reconstructed using geosynthetics to address soft soils and shallow utilities, reducing excavation and aggregate use.