The Department of Water Resources (DWR) manages California's water resources, systems, and infrastructure. One of the significant challenges DWR faced was restoring the natural tidal wetlands in the Sacramento–San Joaquin Delta. This would create diverse tidal and intertidal habitats for native fish and wildlife, including snakes, turtles, hawks, and special-status aquatic species. Solmax was chosen to improve flood management and provide long-lasting protection in the northwestern portion of the Delta. Upon completion, 3,600 acres (1,457 hectares) of natural tidal wetlands were restored.
Solution
The project involved rebuilding three U.S. Army Corps of Engineers (USACE) setback levees, and PROPEX®Armormax was chosen over rock to armor the 2.5 mi (4,023 m) Cache Hass levees. Due to wildlife and flood restraints, the project spanned three construction seasons. Design engineers used standard methods from coastal engineering planning and design, consistent with approaches recommended by the Central Valley Flood Protection Board and the USACE.
The project consisted of three levee segments. Due to the potential wave overtopping for the third levee segment, it was recommended that 80,000 yd2 (73 km2) of PROPEX Armormax be used to limit erosion, support the complex ecosystem, and comply with performance objectives. PROPEX Armormax utilizes both High Performance Turf Reinforcement Mats (HPTRMs) and Engineered Earth Anchors™ (EEA) to lock soil in place and protect against hydraulic stresses, providing dynamic erosion control and slope stabilization solutions.
Performance
The project was a major success, achieving the restoration of 3,600 acres (1,457 hectares) of natural tidal wetlands. The project also improved flood management in the northwestern portion of the Delta. The PROPEX Armormax solution effectively limited erosion, while also maintaining the standard methods from coastal engineering planning and design. Overall, the project was a significant success for DWR, achieving its goal of restoring natural tidal wetlands, creating be beneficial habitats for native fish and wildlife, and improving flood management in the Delta.
Installation of PROPEX Armormax in the Sacramento–San Joaquin Delta involved rebuilding setback levees and using High Performance Turf Reinforcement Mats and Engineered Earth Anchors
This project provides critical habitats for wildlife and improves flood management
Hero Image - PROPEX Armormax used to restore tidal wetlands
Explore more case studies
View allSoft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.
Silt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.