In August 2023, Tropical Storm Hilary brought unprecedented rainfall to the City of Palm Desert, resulting in significant flooding and infrastructure damage. The storm delivered a record-breaking 3.18 inches (8.1 cm) of rain in a single day, marking the region's most intense precipitation event in history. This highlighted the urgent need for robust flood control measures to protect the city against future extreme weather events.
Challenge
During the early 2000s, the City of Palm Desert experienced substantial growth and development. In response, the Section 29 Basin was constructed in 2008 to provide flood control for new developments. This basin, essential for protecting surrounding areas from flooding and erosion, was fortified with PROPEX® Armormax® on its 2:1 slopes to stabilize sandy soils and prevent erosion.
For over 15 years, PROPEX Armormax effectively safeguarded the Section 29 Basin. The city valued PROPEX Armormax for its long-term protection and vegetated solution. However, in 2023, Hurricane Hilary brought unprecedented rainfall, causing widespread flooding and mudslides. The destruction revealed limitations in the city’s existing infrastructure, prompting the need to expand the Section 29 Basin and armor the Mid-Valley channel to improve flood control capabilities.
Plans were made to connect the existing basin to two new basins using PROPEX Armormax. All basins and the mile-long Mid-Valley channel were armored with a total of 40,000 yd2 (33,445 m2) of PROPEX Armormax. These installations will provide flood protection to a larger area, benefiting both residential and commercial developments around the basins and channel.
Projects utilizing PROPEX Armormax for resilient flood protection have been featured in FEMA’s mitigation action portfolio and recognized as a nature-based solution for flood mitigation. The PROPEX Armormax system is designed to promote reinforced vegetation and provide resistance against both hydraulic and non-hydraulic stresses. Additionally, systems using HPTRM for erosion control have been recognized by the EPA as a Best Management Practice (BMP) to improve water quality.
Solution
In response to these challenges, Solmax offered a comprehensive solution for the City of Palm Desert. This integrated approach not only addresses immediate flood control needs but also aligns with long-term urban planning goals, demonstrating Solmax’s commitment to innovative and sustainable infrastructure resilience solutions.
The largest of the two new basins will be converted into Millennium Park, a centerpiece of a large property development that showcases the multifunctional benefits of modern flood control infrastructure. Utilizing PROPEX Armormax in the project provides a sustainable and long-term solution for the community. By implementing these measures, the City of Palm Desert will improve its capacity to manage extreme weather events while creating valuable community assets that contribute to the city's livability and sustainability goals.
Armoring the mile-long Mid-Valley channel with PROPEX Armormax to bolster flood control capabilities
Installation of PROPEX Armormax on the 2:1 slopes of the Section 29 Basin to stabilize sandy soils and prevent erosion.
Using PROPEX Armormax to provide a vegetated solution for long-term flood protection in the expanded flood control system
Implementing PROPEX Armormax to protect residential and commercial developments.
Connecting the existing Section 29 Basin to two new basins using PROPEX Armormax for better flood protection.
Explore more case studies
View allSoft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.
Silt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.