MIRAFI HMi
Explore the case studies
Explore all case studiesCase studies
Subgrade stabilization of a railway with MIRAFI HMi
Discover the Kayseri Boğazköprü project's transformative approach to railway subgrade stabilization using MIRAFI HMi for subgrade stabilization.
Discover moreCase studies
Building a parking lot over soft soils with MIRAFI HMi
The Lidl parking lot project in Teterow used MIRAFI HMi to address poor soil conditions, achieving enhanced structural integrity. Completed on time, the project set new benchmarks in geotechnical engineering.
Discover moreCase studies
Stabilizing unpaved access roads on a solar farm
The solar photovoltaic farm project near Almendralejo, Spain, optimized unpaved internal roads using geosynthetics to address low bearing capacity and challenging subgrade conditions. Despite unexpected rains, the use of MIRAFI HMi ensured stability and durability.
Discover more