Products
Industries
GEOTUBE directs fly ash slurry flow in tailings storage facility closure
Overview
GEOTUBE® dewatering technology is a cost-effective method for removing water from industrial and mineral slurries and sludges. Its flexibility allows for custom solutions to address site-specific challenges and improve operational efficiency.
In this case, GEOTUBE units were used to direct fly ash slurry over specific areas of a tailings storage facility (TSF) during its closure, as part of the closure cap system.
Challenge
The project faced several challenges. First, the slurry had to be assessed to determine if polymer dosing was necessary. Testing in the Geofabrics Gold Coast laboratory concluded that polymer dosing was unnecessary, and direct discharge from the spigots was feasible.
The second challenge was to determine the optimal type and size of tubes, considering how they would be deployed and pumped to create a bunding channel for directing the fly ash slurry.
Solution
The chosen solution involved using GEOTUBE units with dimensions of 9.2 m circumference (30.2 ft) x 61.4 m length (201.8 ft) and 4.4 m circumference (14.4 ft) x 30.6 m length (100.4 ft). The tubes were arranged in a "V" shape, fanning out from the fly ash, to create the discharge bunding. A MIRAFI® Bidim non-woven geotextile and synthetic membrane were placed over the substrate, and the tube units were deployed over the membrane. Marker posts were positioned over the TSF to aid in aligning the tube deployment and visually indicating the depth of the fly ash slurry cover.
The GEOTUBE units were filled directly from the spigots until reaching the predetermined maximum fill heights for the slurry type. They were then allowed to naturally dewater to the calculated consolidated height. Once firm, the fly ash slurry was released over the TSF.
This project demonstrates the versatility of GEOTUBE dewatering technology in addressing mine operational challenges in a practical and cost-effective manner. GEOTUBE units are available in various sizes, with the capacity to hold up to 3,000m³ (105,944 ft³) of dry solids and can be custom fabricated to meet specific site and operational requirements.
Geotube dewatering fly ash pond
Geotube
Pond closure - fly ash
Explore more case studies
View allSilt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.
Soft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.