>
Products
Industries
Accelerated soft foundation consolidation with Alidrain PVD, Region III, Philippines
Overview
The Central Luzon Link Expressway (CLLEx) is currently being constructed in the Central Luzon region of the Philippines. It will connect the Subic–Clark–Tarlac Expressway (SCTEx) and Tarlac-Pangasinan-La Union Expressway (TPLEx) to the North Luzon East Expressway, which is under construction in Cabanatuan, heading towards San Jose, Nueva Ecija.
The project aims to provide faster access from Metro Manila to Cabanatuan City, which serves as the hub city for Pacific Ocean Coastal Area Development. Additionally, it will alleviate traffic congestion on the Pan-Philippine Highway (Daang Maharlika).
The soil conditions in the area where the expressway will be built consist of soft clay foundations. The natural consolidation process for surcharge loading is excessively time-consuming, and there is a significant concern regarding foundation instability.
Challenge
Alidrain® Prefabricated Vertical Drains (PVDs) have been selected to address the consolidation of soft soil in this expressway project. By using Alidrain PVDs, the settlement of soft clay foundation layers is accelerated, and the undrained shear strength of the soft clay foundation is increased. These improvements enhance the stability of the soft clay material.
Solution
The initial phase of the project involved installing Alidrain PVDs. This process began by constructing a stable working platform on top of the soft clay foundation. Then, the Alidrain PVDs were installed by vertically vibrating a hollow steel mandrel containing the prefabricated vertical drains into the soft clay foundation. The spacing between the drains was 1 m2 (10.76 ft2). The installation depth ranged from 2 to 7.5 m2 (6.56 to 24.61 ft2), depending on the thickness of the soft clay foundation.
The use of Alidrain PVDs significantly reduced consolidation time and improved the stability of the soft clay foundation.
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES 3
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES
Explore more case studies
View allSilt trap dewatering for Kestrel Coal Mine
Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.
Soft-soil consolidation improvements ensure new housing development launches on time
Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry
A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.