Case studies

Silt trap dewatering for Kestrel Coal Mine

november 2024

Kestrel Coal Resources restored silt trap capacity by dredging and dewatering 40,000m³ of silt using GEOTUBE units. The project preserved coal fines for sale.

Read the article
GEOTUBE units were laid on a prepared subgrade with plastic perimeter barriers to catch runoff, ensuring efficient silt containment during dewatering

Filter by

quarrying
Innovative application of new GEOTUBE technology incorporating moisture draining yarns for enhanced dewatering performance of gold tailings slurry

A gold mine in Victoria, Australia, used Solmax GEOTUBE units with moisture-absorbing wicking yarns to improve water release, efficiently managing increased slurry waste in its limited-capacity tailings storage.

quarrying
Soft-soil consolidation improvements ensure new housing development launches on time

Solmax provided a custom GSE HD geomembrane solution for the Summarecon Housing Estate in Bandung, enabling full soil consolidation in four months and ensuring the project launched on time.

quarrying
Addressing water ponding issues at Selangor Turf Club using MIRAFI

MIRAFI FWL geotextile was installed at Selangor Turf Club to address water ponding issues, enhancing drainage efficiency and ensuring prompt track usability.

quarrying
Addressing surface cracking on Queen Street, Yeppoon

Livingstone Shire Council used MIRAFI H2Rx to upgrade Queen Street, Yeppoon, addressing surface cracking due to a soft, saturated subgrade.

quarrying
Improving subgrade stabilization and moisture management in roadways

Libmanan Road in Camarines Sur was reconstructed using MIRAFI H2Rx geotextile for improved subgrade stabilization and moisture management, enhancing road durability.

quarrying
Improving the durability and performance of pavement under heavy traffic conditions

Using MIRAFI® H2Rx woven geotextile to improve pavement performance on Thailand's National Highway No. 117, addressing severe pavement damage.

quarrying
Managing subgrade stabilization and moisture for railway structures with MIRAFI H2Rx

China Academy of Railway Sciences utilized MIRAFI H2Rx products to manage subgrade moisture and frost heave in the Harbin-Yichun High-speed Railway, ensuring stability and environmental protection.

quarrying
Advancements in sand island reclamation with GEOTUBE Marine technology

GEOTUBE Marinetechnology was employed to construct a dyke, effectively reclaiming 507 acres in Malaysia.

quarrying
GEOTUBE Geobags used in coastal erosion control and protection project 

In 2023, GEOTUBE Geobags were used to stabilize the eroding Brunei coastline, enhancing safety and sustainability.

quarrying
Reconstructing Jalan Kampung Lombong road with MIRAFI

The Jalan Kampung Lombong road reconstruction in Klang, Selangor, improved durability, and load capacity, addressing frequent truck traffic and adverse weather challenges.

quarrying
Improving waste management with GSE

To meet the growing needs of a rapidly expanding resources industry, Pilbara Regional Waste Managment used GSE geomembranes at their new waste management facility.

quarrying
Transforming Shanghai's waste management with a double layer landfill

Shanghai's first double-layer rigid structure landfill overcame challenges of material supply and competition, to ensure successful completion and extended the landfill's service life with GSE HD geomembranes.

quarrying
Improved connectivity and resilience for the Chiang Rai bypass road project

MIRAGRID GX geogrids transformed Chiang Rai's infrastructure, boosting safety and efficiency as well as seismic resilience.

quarrying
Enhancing frac pond liner integrity with the GSE Leak Location Suite

The GSE Leak Location Suite, including the S-100 Spark Tester, was successfully implemented at a frac pond project in Laredo, Texas, ensuring leak-free installation and quick identification of punctures in the liner.

quarrying
Biogas cover turns palm oil waste into fuel in Malaysia

Cenergi transforms POME into renewable biogas in Malaysia, using GSE geomembranes. This project reduced GHG and the approach highlights innovation in waste recycling and contribution to renewable energy goals.

quarrying
Meeting stringent CCR regulations with BENTOLINER

Xcel Energy successfully closed Sherco Pond No.1 and constructed Sherco Pond No.2 using BENTOLINER to meet stringent CCR regulations, ensuring minimal environmental impact and continuous service.

quarrying
Sewage lagoon upgrade using geosynthetic clay liners

Discover how Conquest's sewage lagoon upgrade using a geosynthetic clay liner overcame groundwater challenges, enhancing efficiency and reducing costs.

quarrying
Conquering extreme conditions with a high-temperature liner solution

Saskatchewan's first new potash mine in 40 years features advanced GSE HDH liners in its brine ponds, overcoming extreme temperatures and chemical exposure.

quarrying
Lining canals for mega Port Said aquaculture project

Egypt's mega aquaculture project in East Port Said completed phase two, using GSE HD geomembrane for water containment in a 20,000-acre fish and shrimp farm.

quarrying
GSE Leak Location Conductive liner 24 years later

At the Florence Copper mine in Arizona, a pond built in 1997 with GSE Leak Location liner, operated for 24 years. Initially underutilized, its expansion required inspection of the exposed geomembrane.

quarrying
Anchorage regional landfill-expansion project

In 2020, Anchorage expanded its landfill with a new cell, installing a composite liner system that included BENTOLINER, GSE HD liner, and HDPE piping.

quarrying
GEOTUBE dewatering and containment of gypsum wastes at a titanium dioxide plant

Industrial waste, often in slurry form and containing contaminants, needs to be managed and disposed of properly to protect the environment.

quarrying
GEOTUBE directs fly ash slurry flow in tailings storage facility closure

GEOTUBE dewatering technology is a cost-effective method for removing water from industrial and mineral slurries and sludges.

quarrying
GEOTUBE breakwaters: shoreline protection at Sigandu Beach

The breakwater structure constructed with the GEOTUBE system at Sigandu Beach proved to be a cost-effective solution compared to conventional methods such as rock armor.

quarrying
Maximizing mineral recovery with dewatering for a remote gold mine in Indonesia

A remote gold mine located on an Indonesian island required the dredging of heavily silted settling ponds. These ponds contained valuable gold deposits that needed to be recovered and reprocessed.

quarrying
Recovering fertilizer from palm oil mill effluent (POME) with GEOTUBE dewatering technology

GEOTUBE units are used to dewater the POME sludge. The units retain the solid particles within the tube, while the liquid can be recycled back through the plant or discharged through the polishing ponds.

quarrying
GEOTUBE solution for rare earth waste containment and dewatering

Processing and refining rare earth minerals generates a waste stream that must be managed and stored in an environmentally secure manner.

quarrying
Overcoming workspace constraints in urban municipal wastewater treatment plant

The project involved upgrading an old, aerated sewage lagoon into a modern enclosed underground sewage treatment facility.

quarrying
Mine wastewater management at MMG Rosebery Gold Mine

The MMG Rosebery mine in Tasmania has been a successful underground mining operation for over 80 years, producing gold, zinc, copper, and lead concentrates.

quarrying
Transforming coal mine settling ponds with GEOTUBE dewatering

A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia.

quarrying
Durable GEOTUBE solution for Clark Airport waterway revetment

The GEOTUBE SFM serves as revetment for the entire waterway network at the new Clark Airport Terminal.

quarrying
GEOTUBE dewatering: Innovative submerged sediment removal at Brisbane River

In a groundbreaking project in Australia, a specially designed remote-controlled underwater dredger was used to clear and clean a blocked stormwater drain that discharged into the Brisbane River.

quarrying
Asia's longest dewatering GEOTUBE in Indonesia's Kalimantan region

This project holds the distinction of being Asia's longest GEOTUBE dewatering project.

quarrying
Revitalizing Tianjin Eco-City: Sustainable wastewater cleanup and transformation

The GEOTUBE dewatering containers were used to contain the dredged slurry and remove water from the material, achieving a consistency similar to compacted borrowed material.

quarrying
Geocontainment solutions for riverbank protection in Tanjung Manis, Malaysia

The OGC jetty expansion project aims to construct two berths, each 200 m (656 feet) long with a 12m (39 feet) draught, to accommodate larger vessels. The project also involves bank protection works.

quarrying
Subgrade stabilization for stormwater management

Geosynthetics, such as MIRAFI HP380a geotextile, have proven to be effective in enhancing the performance of roads and load support structures.

quarrying
Riverbank erosion protection with woven geobags in Sungai Choh, Malaysia

The housing developments near Sg. Choh in Selangor, Malaysia experiences high surface runoff, causing a significant increase in the river's water volume. This has led to severe erosion along approximately 200 m of the riverbank, posing a risk of collapse.

quarrying
Enhancing soft soil embankments with MIRAFI

A 2 km (1.2 mi) causeway had to be constructed through a river estuary as part of the services corridor. The estuarine mud foundation in the river estuary was soft to firm, posing challenges for construction.

quarrying
Strengthening steep slopes with geocomposite reinforcement

To make the project cost-effective and efficient in terms of logistics, a reinforced soil system utilizing the available on-site earth was chosen. The excavated residual soil, which has a high fines content, could be used as backfill material.

quarrying
Pengerang Integrated Petroleum Complex: Basal reinforced embankment solution

The access road plays a vital role in reducing transportation distance and time. To create the road network, a series of basal reinforced embankments were designed based on the existing ground terrain.

quarrying
Enhancing embankment stability on soft soil for Navi Mumbai Coastal Road

MIRAFI PET 800/50, a high strength polyester woven geotextile with a tensile strength of 800kN/m (45.4 lb/ft), was employed to ensure embankment stability within the specified criteria.

quarrying
Road base reinforcement at NAIA Expressway, Paranaque City, Philippines

The NAIA Expressway is a 1.6 km (1 mile) elevated expressway in Metro Manila, Philippines. It connects the Metro Manila Skyway to Ninoy Aquino International Airport and Entertainment City, serving as the first airport expressway in the country. 

quarrying
Protecting Langkawi's Meritus Pelangi Beach with GEOTUBE

The installation process involved deploying scour aprons and filling anchor tubes prior to placing the GEOTUBE unit. The targeted shoreline area was trimmed back before laying the filled Geobags in an overlapping shingle style from the embankment's base.

quarrying
Slope failure repair using MIRAFI Polyfelt PEC: Langkawi, Malaysia

The reinforced soil structure consisted of a 30m-high (98 ft) slope reinforced from the toe of the failed embankment. The facing system used involved wrapping a net around bags filled with fine-grained soil.

quarrying
Road embankment slope repair with MIRAGRID GX

The road connecting Khun Tan and Lampoon in Northern Thailand is vital for their economic link. Unfortunately, the embankment at KM 11 failed, causing significant traffic disruptions and posing risks to road users.

quarrying
The longest sea-crossing bridge constructed with GEOTUBE

Over 27 km (16.8 miles) of geotextile tubes were installed for the construction of the Lach Huyen Bridge in Vietnam.

quarrying
Enhancing road infrastructure with a reinforced soil wall

After careful analysis, it was determined that a segmental retaining wall using MIRAFI Polyfelt PEC was the most suitable option compared to alternatives such as building a bridge or excavating the hill.

quarrying
Geotextile solution for seafloor pipeline laying in Jamnagar, Gujarat

The Jamnagar refinery, located in northwest India, is a crude oil refinery with a production capacity of 661,000 barrels per day.

quarrying
Constructing an artificial island with GEOTUBE

For constructing the edge levees that formed the temporary platform, GEOTUBE GT1000 was chosen.

quarrying
Basal reinforcement with MIRAFI PET geotextiles

MIRAFI PET reinforced geotextiles proved to be the most economical solution for addressing the localized failure of the road embankment.

quarrying
Stable subgrade solution for container yard in Malaysia

Infrastructure developments in Southeast Asia often involve construction on soft soils, which present significant challenges.

quarrying
Boracay Island: Slope erosion protection and revegetation project

The PROPEX Envirocell’s purpose is to retain sufficient topsoil on the steep slope and promote the growth of grass and other vegetation.

quarrying
Almacen river improvement: Flood mitigation with GEOTUBE

The construction involves the placement of GEOTUBE GT750M, scouring apron, and protection geotextiles.

quarrying
Expansion of Xinfeng Landfill with reinforced soil containment bund

Guangzhou, the third largest city in China, is a major manufacturing and commercial center with over 10 million residents.

quarrying
Installation of customized PET reinforcement panels in harbor seawall construction

Shute Harbor, an important gateway to Whitsunday Island hotels and the Great Barrier Reef, was severely damaged by Cyclone Debbie in March 2017.

quarrying
MIRAFI PET reinforcement bridging soft coal fines, tailings storage closure

MIRAFI PET reinforcement geotextiles are widely used globally in civil ground improvement and the capping of tailings storage facilities (TSF) before placing cover material.

quarrying
Efficient bridge abutment with a mechanically stabilized earth wall using MIRAFI

The NLEX-Ciudad de Victoria Interchange project aimed to improve mobility and accessibility in Bulacan, connecting Bocaue, Sta. Maria, Pandi, Norzagaray, Angat, and nearby towns.

quarrying
Effective sediment control for dredging with GEOTUBE

Manila Bay’s environment is rapidly deteriorating due to high pollution levels from various sources such as marine, domestic, industrial, and commercial waste. This

quarrying
Segmental block wall: Davao coastal road, Bago-Aplaya section

In the Bago-Aplaya Section facing Davao Gulf towards Talomo, an elevated highway with a 90-degree vertical slope on both sides, the contractor needed to stabilize and reinforce the embankments effectively.

quarrying
Accelerated soft foundation consolidation with Alidrain PVD, Region III, Philippines

The Central Luzon Link Expressway (CLLEx) is currently being constructed in the Central Luzon region of the Philippines.

quarrying
Revitalizing road surfaces using MIRAGRID PGM 14 for asphalt cracking

In collaboration with our partner ESHA Infrasolutions, Solmax provided the perfect solution for the Dongeradeel community in the Netherlands.

quarrying
Geomembranes protecting the environment at a stack pond in China

Phosphate mining is an important economic activity in the inland Chinese province of Hubei, which boasts large reserves of valuable phosphates.

quarrying
Containment for hazardous waste disposal at Jinchang City

Solmax was chosen to supply a high-grade, multi-layer solution comprised of 1.00 mm GSE HD and 2.00 mm GSE HD conductive geomembrane, each spanning an area of 25,700 m² (276,600 f²).

quarrying
Lining a tailings facility on the roof of the world

Solmax geomembranes were used to line the tailings facilities of the recently expanded Yulong Copper Mine. The mine located in the Qinghai-Tibet Plateau, on one of the largest copper deposits in China, is important to the economy of the region.

quarrying
Increasing wastewater treatment capacity to serve a growing town

The Municipality of Tweed is located in central-eastern Ontario. In 2019, the Municipality identified that the existing wastewater treatment system was nearing its rated capacity.

quarrying
Quick installation in challenging geographies at Bornhausen landfill

Bornhausen Landfill is in Seesen, a town in the district of Goslar, in lower Saxony, Germany.