Case studies

GEOTUBE Geobags used in coastal erosion control and protection project 

august 2024

In 2023, GEOTUBE Geobags were used to stabilize the eroding Brunei coastline, enhancing safety and sustainability.

Read the article

Filter by

quarrying
Robust geomembrane lining for ITY Gold Mine tailings storage facility

Endeavour Mining Corporation's ITY gold mine in Côte d'Ivoire, employing Solmax's GSE HD geomembrane, successfully completed its tailings storage facility project ahead of schedule.

quarrying
Improving waste management with GSE

To meet the growing needs of a rapidly expanding resources industry, Pilbara Regional Waste Managment used GSE geomembranes at their new waste management facility.

quarrying
Subgrade stabilization of a railway with MIRAFI HMi

Discover the Kayseri Boğazköprü project's transformative approach to railway subgrade stabilization using MIRAFI HMi for subgrade stabilization. 

quarrying
Stabilizing embankments under challenging conditions with MIRAGRID

Exploring the Kuzmin-Sremska Raca project, a key infrastructure initiative aimed at enhancing Serbia-Bosnia connectivity through strategic construction.

quarrying
Stabilizing unpaved access roads on a solar farm

The solar photovoltaic farm project near Almendralejo, Spain, optimized unpaved internal roads using geosynthetics to address low bearing capacity and challenging subgrade conditions. Despite unexpected rains, the use of MIRAFI HMi ensured stability and durability.

quarrying
Building a parking lot over soft soils with MIRAFI HMi

The Lidl parking lot project in Teterow used MIRAFI HMi to address poor soil conditions, achieving enhanced structural integrity. Completed on time, the project set new benchmarks in geotechnical engineering.

quarrying
Urban water management improves water quality and wildlife

Ishøj Lake transformed using tube GEOTUBE dewatering to improve water quality and support wildlife.

quarrying
Enhancing frac pond liner integrity with the GSE Leak Location Suite

The GSE Leak Location Suite, including the S-100 Spark Tester, was successfully implemented at a frac pond project in Laredo, Texas, ensuring leak-free installation and quick identification of punctures in the liner.

quarrying
Coastal defence solution safeguards wind energy infrastructure

Innovative project connects wind farms to the grid, using a massive sand-based platform to prevent flooding and ensure energy transition.

quarrying
Biogas cover turns palm oil waste into fuel in Malaysia

Cenergi transforms POME into renewable biogas in Malaysia, using GSE geomembranes. This project reduced GHG and the approach highlights innovation in waste recycling and contribution to renewable energy goals.

quarrying
Transforming a historic railway into a cycle path with MIRAGRID

Austria's Haager Lies became its first barrier-free cycle path, transforming a historical railway through strategic engineering and materials to boost the regional cycle network. 

quarrying
Beach enhancement at Marina of Portimão

The Marina of Portimão project, led by Solmax and Geosin, innovatively created a beach with reduced wave action, using underwater GEOTUBE systems, enhancing attractiveness and reducing maintenance costs.

quarrying
Enhancing coastal resilience at La Croisette Beach, Cannes

GEOTUBE systems played a crucial role in coastal protection for Cannes' iconic La Croisette beach, ensuring resilience and uninterrupted beachside experiences.

quarrying
Impermeable heap leach pads for gold mine

In a West African gold mine, tailored geomembrane solutions improved environmental safety and resource recovery, adapting to specific site needs.

quarrying
Contaminated water management at Europe's largest nickel mine

Europe’s largest nickel mine faced environmental challenges from water contamination due to rainfall, mining activities, and a tailings pond leak, requiring an innovative GEOTUBE technology solution.

quarrying
Protection of the beach of Hotel Oceana Club in Moudania, Greece.

In Greece, a hotel enhanced its beach experience by installing submerged GEOTUBE breakwaters, reducing wave intensity and maintenance.

quarrying
Meeting stringent CCR regulations with BENTOLINER

Xcel Energy successfully closed Sherco Pond No.1 and constructed Sherco Pond No.2 using BENTOLINER to meet stringent CCR regulations, ensuring minimal environmental impact and continuous service.

quarrying
Sewage lagoon upgrade using geosynthetic clay liners

Discover how Conquest's sewage lagoon upgrade using a geosynthetic clay liner overcame groundwater challenges, enhancing efficiency and reducing costs.

quarrying
Conquering extreme conditions with a high-temperature liner solution

Saskatchewan's first new potash mine in 40 years features advanced GSE HDH liners in its brine ponds, overcoming extreme temperatures and chemical exposure.

quarrying
Lining canals for mega Port Said aquaculture project

Egypt's mega aquaculture project in East Port Said completed phase two, using GSE HD geomembrane for water containment in a 20,000-acre fish and shrimp farm.

quarrying
GSE Leak Location Conductive liner 24 years later

At the Florence Copper mine in Arizona, a pond built in 1997 with GSE Leak Location liner, operated for 24 years. Initially underutilized, its expansion required inspection of the exposed geomembrane.

quarrying
Anchorage regional landfill-expansion project

In 2020, Anchorage expanded its landfill with a new cell, installing a composite liner system that included BENTOLINER, GSE HD liner, and HDPE piping.

quarrying
Safer roads with geosynthetic reinforced slopes

Due to increased traffic loadings and seepage problems, a section of the B115 highway in the mountains of Styria, Austria, was showing considerable distress and was in danger of failure.

quarrying
Enhancing runway safety and longevity with MIRAGRID PGM-G at Pula airport

Airport runways must meet strict quality and safety standards. Cracks and uneven surfaces can create hazardous conditions for take-off and landing. The surface of Pula airport had deteriorated after many years of use.

quarrying
Advanced asphalt interlayer solution for Prague airport's runway

Advanced asphalt interlayer solution for Prague airport's runway

quarrying
Revitalizing road surfaces using MIRAGRID PGM 14 for asphalt cracking

In collaboration with our partner ESHA Infrasolutions, Solmax provided the perfect solution for the Dongeradeel community in the Netherlands.

quarrying
Geotextile reinforcement provides stable road construction

Bad Wünnenberg is a town in North Rhine-Westphalia, Germany, located on the river Aabach, approximately 20 km (12.4 mi) south of Paderborn.

quarrying
Protecting Alpine resources from avalanches with geogrids

In Austria alone, approximately 8,000 avalanche corridors experience countless avalanches each year. With climate change exacerbating the situation, the threat of avalanches to inhabited areas is ever-present in the Alpine regions.

quarrying
Making roads more durable with MIRAGRID PGM G

The A617 is a primary A-road in Derbyshire and Nottinghamshire (East Midlands) in England. Over time, cracks appeared on the road, and rehabilitation was needed.

quarrying
Drainage behind a concrete wall Mauritius Island

The Government of Mauritius, through the Road Development Authority, initiated the construction of the A1-M1 Link Road to create an effective and efficient road network that supports socio-economic development.

quarrying
Expanding landfills safely with geosynthetics

Attica’s 66 municipalities and four million inhabitants depend on a single landfill – Fili. First established in 2003, the Fili landfill was expanded in 2006 and continues to grow.

quarrying
Geomembranes protecting the environment at a stack pond in China

Phosphate mining is an important economic activity in the inland Chinese province of Hubei, which boasts large reserves of valuable phosphates.

quarrying
Preventing potash waste contamination with Solmax geomembranes

K+S Minerals and Agriculture GmbH Werra plant, operates a tailings heap at their Hattorf site for depositing the residue produced during crude salt processing.

quarrying
Geosynthetic lining system for potassium nitrate evaporation ponds

Solmax's innovative liners met client's requirements, protecting environment and communities from pollution and facilitating safe wastewater removal.

quarrying
Protecting shorelines from erosion in Lake McConaughy, Nebraska

GEOTUBE TC1200MB units were selected to provide erosion control because they can be filled using on site materials, making them a more efficient solution than importing stone.

quarrying
Containment for hazardous waste disposal at Jinchang City

Solmax was chosen to supply a high-grade, multi-layer solution comprised of 1.00 mm GSE HD and 2.00 mm GSE HD conductive geomembrane, each spanning an area of 25,700 m² (276,600 f²).

quarrying
Lining a tailings facility on the roof of the world

Solmax geomembranes were used to line the tailings facilities of the recently expanded Yulong Copper Mine. The mine located in the Qinghai-Tibet Plateau, on one of the largest copper deposits in China, is important to the economy of the region.

quarrying
Increasing wastewater treatment capacity to serve a growing town

The Municipality of Tweed is located in central-eastern Ontario. In 2019, the Municipality identified that the existing wastewater treatment system was nearing its rated capacity.

quarrying
Quick installation in challenging geographies at Bornhausen landfill

Bornhausen Landfill is in Seesen, a town in the district of Goslar, in lower Saxony, Germany.