Products
Murrieta Creek stabilization
Overview
Murrieta Creek has a history of devastating flooding. Notably, the flood of 1993 that claimed the lives of five people and damaged 70 aircraft and two bridges at Pendleton Marine Corps Base. The flood also inundated pumps at the Eastern Municipal Water District, causing 5 million gallons of raw sewage to flow into the creek. Multiple major flood events have occurred since the 1993 flood. Today, more than 600 homes and commercial structures are vulnerable to flooding.
Solution
In 2000, the U.S. Army Corps of Engineers initiated the Murrieta Creek Flood Control, Environmental Restoration and Recreation Project to mitigate flooding. In phase two of the project, PROPEX® Armormax was selected to provide erosion and scour protection on the creek banks.
The system consists of High Performance Turf Reinforcement Mat (HPTRM) and earth anchors that provide resilient flood control for up to 75 years. Maintaining water quality was a main concern because Murrieta Creek is recognized as one of the last high quality, minimally disturbed riverine environments in Southern California.
PROPEX Armormax helps to decrease sedimentation and pollutants and encourages infiltration of water back into the groundwater table. The system also promotes rapid root development for long-term vegetation, whereas rock riprap, can decrease streamside vegetation and adversely impact fish populations. Vegetation was quickly established, and PROPEX Armormax has effectively protected the channel from erosion and flooding





Explore more case studies
View allStabilizing soft clay soils and shallow utilities during the reconstruction of Main Street
Main Street in Palisade, CO, was reconstructed using geosynthetics to address soft soils and shallow utilities, reducing excavation and aggregate use.

MIRAFI geotextiles optimize stability and reduce costs at Cargill’s Regina facility
Cargill's Regina facility used MIRAFI H2Ri to stabilize expansive, frost-susceptible soils, reducing sub-ballast thickness by 55% and road construction costs by 20%.
Reinforcing stability in harsh weather with MIRAFI RS580i
Approximately 6 acres of parking lots at a commercial office complex in Maine were rebuilt using MIRAFI RS580i to stabilize the base course, minimize excavation, and withstand extreme freeze-thaw conditions.