Skip to main content
Case studies

MSE walls with MIRAGRID XT for rail expansion

GO Transit used hybrid MSE walls with MIRAGRID XT geogrids to stabilize embankments on Lakeshore West Line, ensuring stability under space and load constraints.

Read the article
MSE walls with MIRAGRID XT for rail expansion

Filter by

quarrying

MIRAFI geotextiles prevent subgrade failure and reduce track downtime

Canadian Pacific Railway (CP) identified track settlement issues and partnered with Solmax and Clifton Associates to implement a geosynthetic solution, reducing ballast use by 43% and completing repairs on a 72 ft section in under seven hours. 

quarrying

MIRAFI geotextiles optimize stability and reduce costs at Cargill’s Regina facility 

Cargill's Regina facility used MIRAFI H2Ri to stabilize expansive, frost-susceptible soils, reducing sub-ballast thickness by 55% and road construction costs by 20%. 

quarrying

Stabilizing soft clay soils and shallow utilities during the reconstruction of Main Street 

Main Street in Palisade, CO, was reconstructed using geosynthetics to address soft soils and shallow utilities, reducing excavation and aggregate use.

quarrying

Bell Middle School stabilizes slope with PROPEX Pyramat 75

The Bell Middle School's steep landfill slope faced erosion issues, causing soil to wash into nearby homes. The geocell used for stabilization failed, so the school district replaced it with PROPEX Pyramat 75, a high-performance turf mat.

quarrying

MSE pile-supported embankment with MIRAGRID 8X

The I-15 CORE Project in Provo, Utah, used a pile-supported embankment with MIRAGRID 8XT geogrid to stabilize soft soils and meet seismic and space constraints.

quarrying

Reinforcing stability in harsh weather with MIRAFI RS580i

Approximately 6 acres of parking lots at a commercial office complex in Maine were rebuilt using MIRAFI RS580i to stabilize the base course, minimize excavation, and withstand extreme freeze-thaw conditions.

quarrying

Constructing a working platform for Akron Main Outfall Sewer with MIRAFI RS580i 

Solmax partnered with Kenmore Construction to stabilize a working platform for heavy equipment at the City of Akron’s Main Outfall Sewer Improvements project using MIRAFI RS580i high-performance geotextile and advanced geotechnical analysis. 

quarrying

Stabilizing Red Hill landfill cap with PROPEX Armormax

Red Hill Landfill in Northern California stabilized a failed slope using the PROPEX Armormax  system with PROPEX Pyramat 75 HPTRM and B3 anchors, enhancing safety and erosion control. 

quarrying

Slope stabilization and moisture control on Old Pacific Highway

A global stability issue on the Old Pacific Highway caused a slope failure and pavement cracking. The MIRAFI H2Ri system was used to address soil saturation and prevent future slips, ensuring long-term stability without extensive over-excavation. 

quarrying

Reflective cracking prevention at DeKalb-Peachtree Airport with Petromat 

Reflective cracking at DeKalb-Peachtree Airport was mitigated using Petromat MPV600, a nonwoven paving fabric, installed directly on the cement-treated base to prevent moisture infiltration and extend pavement life

quarrying

Long-term erosion control and channel stabilization for Arroyo de los Montoyas with PROPEX Armormax

PROPEX Armormax stabilized the eroding embankments of Arroyo de los Montoyas, protecting WWTP6 from flooding and enhancing groundwater recharge in Rio Rancho, NM, with a resilient, nature-based erosion control solution.

quarrying

Rebuilding U.S. Route 441 and enhancing flood resilience with MIRAFI

U.S. Route 441 in Gainesville, Florida was reconstructed using MIRAFI RS580i, improving performance against flooding and reducing maintenance needs.

quarrying

Slope stabilization for residential slope failure at Yerba Buena Island with PROPEX

Yerba Buena Island's redevelopment addressed slope failure with PROPEX Armormax, ensuring slope stability, erosion control, and utility protection during a major residential project. 

quarrying

Relining Aeration Basin 2 at Thompson's Station wastewater plant

Aeration Basin 2 at Thompson's Station wastewater plant was relined in 2012 using a custom GSE HD geomembrane system, ensuring operational efficiency. 

quarrying

Motiva Brine pond liner replacement and leak inspection with GSE

The Motiva Brine Pond in southeast Texas, supporting butane storage in salt caverns, underwent primary liner replacement and inspection to address leakage issues. 

quarrying

Palm Desert flood control improvements with PROPEX protects from tropical storms

The City of Palm Desert improved flood control infrastructure by expanding the Section 29 Basin, constructing two new basins, and armoring the Mid-Valley channel with PROPEX Armormax. 

quarrying

Geosynthetic reinforcement to successfully repair a railway track section

CN Railway utilized MIRAFI RS580i to stabilize track foundations at the Rosetown subdivision, improving safety, and reducing future maintenance costs in challenging conditions. 

quarrying

Effective landfill closure at Homer Solid Waste Facility with GSE

Kenai Peninsula Borough in Alaska completed phase two of the Homer Solid Waste Facility landfill closure using Solmax geosynthetics, covering 226,000 ft² with a geosynthetic clay liner, drainage, and landfill-gas system.

quarrying

Restoring tidal wetlands and providing long-lasting erosion protection

The Department of Water Resources (DWR) successfully restored natural tidal wetlands in the Sacramento–San Joaquin Delta, enhancing habitats for wildlife and improving flood management.

quarrying

Protecting homes from destructive erosion and slope instability with PROPEX

In Fort Worth, Texas, Candleridge Park addressed erosion threatening neighborhood foundations by constructing a channel outlet and using PROPEX Pyramattress and PROPEX Pyramat 75 for cost-effective, sustainable slope protection.

quarrying

Mitigating the risks of groundwater contamination during expansion of Sarasota Municipal Landfill

Advanced leachate containment solutions were utilized to enhance the Sarasota landfill expansion, ensuring environmental protection and compliance with regulations.

quarrying

Bridging sinkhole voids with MIRAGRID XT

Thurber Engineering and Solmax used MIRAGRID XT geogrid to remediate William Griffin Recreation Centre's turf, stabilizing voids and enhancing field performance. 

quarrying

Trilogy at Monarch Dunes, Nipomo, California

Monarch Dunes needed a sustainable solution for severe channel erosion in a community vineyard. The combination of PROPEX Armormax and Pyramattress provided durable, eco-friendly stabilization, reducing installation time and cost.

quarrying

Improving the grading and capacity of an existing channel

The Lloydminster's Northwest Drainage Channel was redesigned to prevent flooding, using PROPEX Pyramat for enhanced flow capacity and erosion control.

quarrying

Protecting homes from flooding events with PROPEX Armormax

Baton Rouge's flood mitigation measures included PROPEX Armormax to reduce risks and protect homes against future flooding.

quarrying

Roadway reconstruction on STH-106 with MIRAFI

Jefferson County Highway Department successfully reconstructed Wisconsin Highway 106 over marshland, using geosynthetic materials to minimize excavation and ensure a stable, well-drained road surface.

quarrying

Stabilization and construction of a new arterial roadway in using MIRAFI

Effective stabilization of fine-grained subgrade soils and the implementation of MIRAFI RS580i led to a new roadway that exceeded performance expectations.

quarrying

Overcoming soft soil challenges with MIRAFI

Utilizing MIRAFI RS580i for stable construction, the East Lake Sammamish Trail overcame soft soil challenges, reducing costs and material waste effectively.

quarrying

Enhancing frac pond liner integrity with the GSE Leak Location Suite

The GSE Leak Location Suite, including the S-100 Spark Tester, was successfully implemented at a frac pond project in Laredo, Texas, ensuring leak-free installation and quick identification of punctures in the liner.

quarrying

Meeting subgrade stabilization challenges with MIRAFI

Utilizing MIRAFI RS380i geotextile fabric, this project overcame poor subgrade conditions to construct four commercial buildings with stable platforms for parking lots and loading docks.

quarrying

Biogas cover turns palm oil waste into fuel in Malaysia

Cenergi transforms POME into renewable biogas in Malaysia, using GSE geomembranes. This project reduced GHG and the approach highlights innovation in waste recycling and contribution to renewable energy goals.

quarrying

IMAX parking lot's innovative stormwater system with MIRAFI

In 2012, Mississauga's IMAX parking lot implemented a low impact development system to manage stormwater, enhancing water quality and maintaining pavement integrity.

quarrying

Enhancing road resilience in Alaska with MIRAFI

Alaska's Dalton Highway demonstrated the effectiveness of MIRAFI H2Ri in enhancing road durability and reducing maintenance in extreme environments. 

quarrying

Meeting stringent CCR regulations with BENTOLINER

Xcel Energy successfully closed Sherco Pond No.1 and constructed Sherco Pond No.2 using BENTOLINER to meet stringent CCR regulations, ensuring minimal environmental impact and continuous service.

quarrying

How Impact Solar Farm overcame road stabilization challenges with MIRAFI

MIRAFI RS280i was used at Impact Solar Farm in Texas for efficient road stabilization, offering environmental benefits and cost savings.

quarrying

Sewage lagoon upgrade using geosynthetic clay liners

Discover how Conquest's sewage lagoon upgrade using a geosynthetic clay liner overcame groundwater challenges, enhancing efficiency and reducing costs.

quarrying

Lining canals for mega Port Said aquaculture project

Egypt's mega aquaculture project in East Port Said completed phase two, using GSE HD geomembrane for water containment in a 20,000-acre fish and shrimp farm.

quarrying

Conquering extreme conditions with a high-temperature liner solution

Saskatchewan's first new potash mine in 40 years features advanced GSE HDH liners in its brine ponds, overcoming extreme temperatures and chemical exposure.

quarrying

Increasing roadway design life with MIRAFI

116th Ave in Grande Prairie was reconstructed using MIRAFI H2Ri, overcoming failures from heavy traffic and challenging soil, improving road longevity and performance.

quarrying

Kaneohe Stream bank restoration

Hawaii's Kaneohe Stream stabilization project used PROPEX Pyrawall, a natural, vegetated solution, to protect properties and prevent flooding for up to 75 years.

quarrying

Murrieta Creek stabilization

Murrieta Creek's flood control project uses PROPEX Armormax for erosion protection and environmental restoration, ensuring safety and water quality for 75 years.

quarrying

Harvey Ditch erosion protection with PROPEX

BKDD used PROPEX Scourlok for durable, environmentally-friendly erosion protection along a drainage channel in Texas, replacing gabion baskets with a long-lasting solution.

quarrying

Oyster Lake outfall improvement

Oyster Lake's outfall, strained by storms and urban growth, was reinforced using PROPEX Armormax for erosion control. It withstood Hurricane Michael, protecting the area.

quarrying

GSE Leak Location Conductive liner 24 years later

At the Florence Copper mine in Arizona, a pond built in 1997 with GSE Leak Location liner, operated for 24 years. Initially underutilized, its expansion required inspection of the exposed geomembrane.

quarrying

Anchorage regional landfill-expansion project

In 2020, Anchorage expanded its landfill with a new cell, installing a composite liner system that included BENTOLINER, GSE HD liner, and HDPE piping.

quarrying

Providing long term stabilization for drainage channel

PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

quarrying

Steep slope stabilization at SR-11 KYTC DISTRICT 10

The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

quarrying

Providing levee resilience and durability

Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.

quarrying

Preventing flooding from arid creeks

PROPEX Armormax helped to decrease sedimentation and pollutants and encourages infiltration of water back into the ground water table.

quarrying

Restoring stream bank while promoting vegetation

Since the completion of the project, the stream has naturally restored itself to its original channel depth.

quarrying

Channel stabilization protects against floods

The end goal of the project is to carry water from future 100-year floods through the city in the channel and eliminate flooding in Randolph.

quarrying

Flood protection and erosion control with PROPEX Pyramat

PROPEX Pyramat is a High Performance Turf Reinforcement Mat (HPTRM) that protects the ground surface from erosion while promoting natural vegetation.

quarrying

Reinforcing slopes in parking lot

Eight, one foot, PROPEX Pyrawall lifts were constructed to raise the grade for the new parking lot.

quarrying

Stabilizing the Des Moines River with PROPEX

The west fork of the Des Moines River in Palo Alto County, had experienced years of erosion and flooding. From 2006 to 2019, the riverbank had receded up to 215 feet in the middle of the bend.

quarrying

Enhancing runway durability with Petromat Enviro

The Altoona-Blair County Airport, a regional airport in central PA, faced a safety concern with one of its runways. Reflective cracking had occurred due to harsh freeze/thaw conditions during winter months.

quarrying

GEOTUBE dewatering and containment of gypsum wastes at a titanium dioxide plant

Industrial waste, often in slurry form and containing contaminants, needs to be managed and disposed of properly to protect the environment.

quarrying

GEOTUBE directs fly ash slurry flow in tailings storage facility closure

GEOTUBE dewatering technology is a cost-effective method for removing water from industrial and mineral slurries and sludges.

quarrying

GEOTUBE breakwaters: shoreline protection at Sigandu Beach

The breakwater structure constructed with the GEOTUBE system at Sigandu Beach proved to be a cost-effective solution compared to conventional methods such as rock armor.

quarrying

Maximizing mineral recovery with dewatering for a remote gold mine in Indonesia

A remote gold mine located on an Indonesian island required the dredging of heavily silted settling ponds. These ponds contained valuable gold deposits that needed to be recovered and reprocessed.

quarrying

Recovering fertilizer from palm oil mill effluent (POME) with GEOTUBE dewatering technology

GEOTUBE units are used to dewater the POME sludge. The units retain the solid particles within the tube, while the liquid can be recycled back through the plant or discharged through the polishing ponds.

quarrying

GEOTUBE solution for rare earth waste containment and dewatering

Processing and refining rare earth minerals generates a waste stream that must be managed and stored in an environmentally secure manner.

quarrying

Overcoming workspace constraints in urban municipal wastewater treatment plant

The project involved upgrading an old, aerated sewage lagoon into a modern enclosed underground sewage treatment facility.

quarrying

Mine wastewater management at MMG Rosebery Gold Mine

The MMG Rosebery mine in Tasmania has been a successful underground mining operation for over 80 years, producing gold, zinc, copper, and lead concentrates.

quarrying

Transforming coal mine settling ponds with GEOTUBE dewatering

A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia.

quarrying

Durable GEOTUBE solution for Clark Airport waterway revetment

The GEOTUBE SFM serves as revetment for the entire waterway network at the new Clark Airport Terminal.

quarrying

GEOTUBE dewatering: Innovative submerged sediment removal at Brisbane River

In a groundbreaking project in Australia, a specially designed remote-controlled underwater dredger was used to clear and clean a blocked stormwater drain that discharged into the Brisbane River.

quarrying

Asia's longest dewatering GEOTUBE in Indonesia's Kalimantan region

This project holds the distinction of being Asia's longest GEOTUBE dewatering project.

quarrying

Revitalizing Tianjin Eco-City: Sustainable wastewater cleanup and transformation

The GEOTUBE dewatering containers were used to contain the dredged slurry and remove water from the material, achieving a consistency similar to compacted borrowed material.

quarrying

The longest sea-crossing bridge constructed with GEOTUBE

Over 27 km (16.8 miles) of geotextile tubes were installed for the construction of the Lach Huyen Bridge in Vietnam.

quarrying

Constructing an artificial island with GEOTUBE

For constructing the edge levees that formed the temporary platform, GEOTUBE GT1000 was chosen.

quarrying

Protecting shorelines from erosion in Lake McConaughy, Nebraska

GEOTUBE TC1200MB units were selected to provide erosion control because they can be filled using on site materials, making them a more efficient solution than importing stone.

quarrying

Containment for hazardous waste disposal at Jinchang City

Solmax was chosen to supply a high-grade, multi-layer solution comprised of 1.00 mm GSE HD and 2.00 mm GSE HD conductive geomembrane, each spanning an area of 25,700 m² (276,600 f²).

quarrying

Lining a tailings facility on the roof of the world

Solmax geomembranes were used to line the tailings facilities of the recently expanded Yulong Copper Mine. The mine located in the Qinghai-Tibet Plateau, on one of the largest copper deposits in China, is important to the economy of the region.

quarrying

Increasing wastewater treatment capacity to serve a growing town

The Municipality of Tweed is located in central-eastern Ontario. In 2019, the Municipality identified that the existing wastewater treatment system was nearing its rated capacity.