Providing levee resilience and durability
Overview
The U.S. Army Corps of Engineers (USACE), embarked on one of the largest and most comprehensive public works projects in American history following the catastrophic damage caused by Hurricane Katrina in 2005. The Hurricane and Storm Damage Risk Reduction System (HSDRRS) program was established to provide the greater New Orleans Area a 100-year level of risk reduction. One of the most critical measures of the HSDRRS was protection of refurbished earthen levees against the erosion-causing hydraulic forces of storm surge overtopping. Without protection, overtopping can lead to significant landside erosion and potentially a breach of the levee. During Hurricane Katrina, most levee failure was due to water overtopping.
Challenge
The USACE needed a proven solution, so they partnered with Colorado State University (CSU) to build a full-scale wave overtopping simulator. The simulator tested erosion resistance of the PROPEX® Armormax® system for 500-year resiliency HSDRRS overtopping conditions. Testing showed that PROPEX Armormax, consisting of High Performance Turf Reinforcement Mat (HPTRM) and Engineered Earth Anchors (EEA), provided increased levee resilience and durability. Additionally testing showed that PROPEX Armormax reinforced vegetation on the earthen levees, which reduces the risk of breaching caused by overtopping waves.
Solution
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.

Providing levee resilience and durability

Providing levee resilience and durability

Breached Levee

CSU Wave Overtop
Explore more case studies
View allStabilizing soft clay soils and shallow utilities during the reconstruction of Main Street
Main Street in Palisade, CO, was reconstructed using geosynthetics to address soft soils and shallow utilities, reducing excavation and aggregate use.

MIRAFI geotextiles optimize stability and reduce costs at Cargill’s Regina facility
Cargill's Regina facility used MIRAFI H2Ri to stabilize expansive, frost-susceptible soils, reducing sub-ballast thickness by 55% and road construction costs by 20%.
Reinforcing stability in harsh weather with MIRAFI RS580i
Approximately 6 acres of parking lots at a commercial office complex in Maine were rebuilt using MIRAFI RS580i to stabilize the base course, minimize excavation, and withstand extreme freeze-thaw conditions.