Transforming coal mine settling ponds with GEOTUBE dewatering
Overview
A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia. The ponds had reached their capacity, and the company had limited available land space. The cleaning process involved a continuous cycle of silt dredging and truck relocation to prevent runoff with high levels of suspended solids from polluting nearby river channels. However, this approach became too costly.
Challenge
To address the issue, the company implemented a GEOTUBE® dewatering facility as part of their cleanout efforts. Over 300 GEOTUBE units were utilized to dewater more than 1,000,000 m³ (1,307,950 yd³) of sediments annually, containing 170,000 m³ (222,411 yd³) of dry solids. The GEOTUBE dewatering tubes were stacked up to seven layers high, using standardized units with a circumference of 36.6 meters (120 feet) and lengths up to 61.4 meters (201 feet), to create large solid landfill structures and optimize land space.
This project stands as one of the largest GEOTUBE dewatering projects ever undertaken worldwide, providing valuable insights into the economics of large-scale GEOTUBE dewatering. It has recently received the 2021 International Achievement Award (IAA) - Award of Excellence.

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE
Explore more case studies
View allStabilizing soft clay soils and shallow utilities during the reconstruction of Main Street
Main Street in Palisade, CO, was reconstructed using geosynthetics to address soft soils and shallow utilities, reducing excavation and aggregate use.

MIRAFI geotextiles optimize stability and reduce costs at Cargill’s Regina facility
Cargill's Regina facility used MIRAFI H2Ri to stabilize expansive, frost-susceptible soils, reducing sub-ballast thickness by 55% and road construction costs by 20%.
Reinforcing stability in harsh weather with MIRAFI RS580i
Approximately 6 acres of parking lots at a commercial office complex in Maine were rebuilt using MIRAFI RS580i to stabilize the base course, minimize excavation, and withstand extreme freeze-thaw conditions.