Constructing an artificial island with GEOTUBE
Overview
The Incheon Grand Bridge is a major project that connects Incheon International Airport with Songdo City in the Incheon Free Economic Zone. Instead of using heavy marine equipment to build the bridge piers over open water, an alternative solution was proposed. It involved constructing an artificial island reclaimed from the sea as a temporary platform for the construction process. This option proved to be more cost-effective than alternatives like sheet piles or rock levees.
Challenge
For constructing the edge levees that formed the temporary platform, GEOTUBE® GT1000 was chosen. The GEOTUBE containers used varied in diameter (3 m [9.8 ft], 4 m [13.1 ft], and 5 m [16.4 ft]) and length (15 m [49.2 ft] to 60 m [196.9 ft]). They were stacked in tiers, reaching a height of approximately 7 m [23 ft] above the soft estuarial deposits. The tubes were installed below sea level, about -1.0 m [-3.3 ft] at the shallow end and -2.8 m [-9.2 ft] at the deeper end. In total, over 14 km [8.7 miles] of GEOTUBE engineered tubes were used.
Solution
The tubes were filled with sand, which was delivered by barges to the construction sites. The sand was mixed with seawater to create a slurry and pumped into the GEOTUBE containers. The space within the tubes was then filled with residual soil to complete the platform.
GEOTUBE installation began in April 2006, and at the peak of construction, three installation equipment set-ups were used to fill three tubes simultaneously. By the end of 2006, the full 14 km [8.7 miles] of filled tubes was completed ahead of schedule and within budget.

Incheon Grand Bridge: Constructing Artificial Island

Incheon Grand Bridge: Constructing Artificial Island
Incheon Grand Bridge: Constructing Artificial Island

Incheon Grand Bridge: Constructing Artificial Island
Incheon Grand Bridge: Constructing Artificial Island
Explore more case studies
View allStabilizing Red Hill landfill cap with PROPEX Armormax
Red Hill Landfill in Northern California stabilized a failed slope using the PROPEX Armormax system with PROPEX Pyramat 75 HPTRM and B3 anchors, enhancing safety and erosion control.

Constructing a working platform for Akron Main Outfall Sewer with MIRAFI RS580i
Solmax partnered with Kenmore Construction to stabilize a working platform for heavy equipment at the City of Akron’s Main Outfall Sewer Improvements project using MIRAFI RS580i high-performance geotextile and advanced geotechnical analysis.

Slope stabilization and moisture control on Old Pacific Highway
A global stability issue on the Old Pacific Highway caused a slope failure and pavement cracking. The MIRAFI H2Ri system was used to address soil saturation and prevent future slips, ensuring long-term stability without extensive over-excavation.