Harvey Ditch erosion protection with PROPEX
Overview
Brookshire-Katy Drainage District (BKDD) maintains a drainage channel that runs along Stalknecht Road in Waller County, Texas. Extreme stormwater flows caused by Hurricane Harvey caused the roadside drainage ditch to experience erosion and slope instability, reducing the channel’s capacity.
The severe erosion and reduction in channel capacity prompted BKDD to pursue permanent erosion protection.
Solution
An early phase in the design process used rock filled gabion baskets to armor the channel, however, the design engineer wanted a more economical and environmentallyfriendly solution. Gabion baskets require the removal and transportation of excavated material from the site, but PROPEX® Scourlok® allows the reuse of on-site soil to fill the units.
Stakeholders selected PROPEX Scourlok for the remaining phases of the project because it was a more cost-effective solution. PROPEX Scourlok is a stabilization system that features rigid and interlocking cells armored with erosion protection from a highly UV stabilized High Performance Turf Reinforcement Mat (HPTRM). The system is engineered to provide a vegetated, gravity wall system that resists sliding and overturning for up to 75 years.
The design included an eight-foot wall, comprised of two tiers of PROPEX Scourlok that spans 500 feet along the eastern side of the channel. The design also included 300 square yards of PROPEX Armormax® along the top of the channel.
Explore more case studies
View allRebuilding U.S. Route 441 and enhancing flood resilience with MIRAFI
U.S. Route 441 in Gainesville, Florida was reconstructed using MIRAFI RS580i, improving performance against flooding and reducing maintenance needs.
Motiva Brine pond liner replacement and leak inspection with GSE
The Motiva Brine Pond in southeast Texas, supporting butane storage in salt caverns, underwent primary liner replacement and inspection to address leakage issues.